Lewisham Schools PFI

Year | 2002
Location | Lewisham, London, UK
Client | Gordonbrock Primary School and Crofton Secondary School

The Private Finance Initiative or PFI is a means of procuring public buildings is strongly advocated by the current government. The major concern with PFI is that design quality is sacrificed in the interests of cutting costs for the private consortium.

Gordonbrock Primary School and Crofton Secondary School in Lewisham SE London are two such schools that are scheduled for demolition with the replacement schools being financed by PFI. The aims of this project is to highlight current problems and to establish a set of design criteria that should be applied to the new schools as a means of ensuring that design quality is not sacrificed.

The first stage was to examine and evaluate the current design guidelines produced by the Department for Education involving study into the teaching day and the National Curriculum.

From this initial research it became evident school spaces require an increasing degree of flexibility to respond to a demanding and ever evolving National Curriculum plus the need for the school to cater for the wider community beyond the constrains of the normal school opening hours. We believe that essential qualities of building design such as site specific architecture and the lack of guidelines for the quality of space should be addressed within our project.

Related posts
CommunityExhibitionStrategic PlanningSustainability StrategyToolkit

Decarbonising Schools

We are a ground-up decarbonisation movement. An accessible and inclusive approach to cutting carbon – using low-tech, low-cost strategies. Empowerment through knowledge and understanding; encouraging a culture shift in schools towards a zero-carbon future.
CommunityCreative ParticipationStrategic PlanningSustainability StrategyToolkit

PEAK Pathways

The PEAK Pathways project encompasses the design of a low-carbon forest school shelter, alongside a instructions for construction based on 1-1 prototyping, and a participation package which includes resources for future workshops. The outputs address both the short term needs of the forest school as well as the long term aspirations of the land owner and client.
AllStrategic Planning

Future Forests

Presenting pathways to creating a thriving woodland hub that embodies Ruskin’s ideals in the 21st century.